| Sewer System Planning Public Meeting - May 17, 2004 |
Held at the Women's Club Pavilion, Lakewood Park,
7:30 PM to 10:00 PM |
Speakers:
Terry Novak, Assistant to the Mayor
John Kilgore, City Engineer
Tina Wolff, M&E Project Manager
Jane McDonough, M&E Outreach Coordinator
Additional Team Members:
Bernie Madison, City Project Manager
Dave Bingham, M&E Principal
Annalisa Saqui, M&E Engineer
Ming Jiang, M&E Engineer |
|
| Meeting Summary |
Approximately 100 people attended the May 17 Public Meeting. Almost all
of the attendees are residents of Lakewood. A few local businesses were
also represented.
Mr. Novak welcomed the participants
and opened the meeting, then introduced other City representatives
and explained the format for the evening. Mr. Novak introduced Mr. Kilgore,
Lakewood's City Engineer.
Mr. Kilgore made opening remarks and explained his perspective
on the sewer issues and his previous involvement with the City related
to the basement flooding issues. Mr. Kilgore described the current sewer
evaluation project and introduced Metcalf & Eddy (M&E) as the
City's engineering consultant. Mr. Kilgore outlined the public involvement
activities for the evening, then introduced Ms. Wolff.
Ms. Wolff provided a presentation that included an overview
of Lakewood's sewer history, the sewer system operation and maintenance,
and typical problems that are found in residential laterals. Ms. Wolff
then described the sewer operation during dry weather and how additional
flows are handled during storm events. Ms. Wolff provided a summary of the City's new Combined
Sewer Overflow (CSO) Long-Term Control Plan, including a description of
the project phases and timeline and a summary of how the sewer system
will be assessed. Ms. Wolff described some of the options for resolving
the sewer's capacity issues including treatment, storage tunnels and tanks,
relief sewers and preventive maintenance. Ms. Wolff then summarized the
technical presentation and introduced Ms. McDonough.
Ms. McDonough summarized the project outreach process
and stressed the importance of input from the community so that the engineering
team can assess the sewer-related issues and develop the best solutions.
Ms. McDonough asked the attendees to consider applying for a Community
Committee to work with the project team, and to provide input by filling
out an index card or by coming up to the microphone for questions and
comments. The meeting was then opened up for questions.
Approximately 30 questions and comments were made by the
meeting attendees, in addition to 18 written comments on index cards.
The most prominent issues and concerns included:
1. Basement flooding. The majority of the meeting attendees
are residents of Lakewood and many of them experience sewer backups and
other basement flooding problems during storm events. Many residents have
conducted regular cleaning and maintenance of their residential sewer
laterals and have installed backflow preventors, but are not able to prevent
the flooding. Many of the attendees appeared frustrated with the flooding
problems and appeared very interested in the sewer project and the potential
to improve the flooding problems through sewer improvements. A number
of very constructive comments were made and there was a high level of
interest from residents who would like to participate in the project and
help the team find the best solutions to the sewer issues.
2. Schedule and costs for sewer improvements. Due to recent
discussion of sewer rate increases by the City Council and due to the
anticipated costs of this project, there was concern about costs to homeowners.
Mr. Novak explained that the sewer rate increases proposed by the Council
were separate from this project and therefore outside the scope of this
meeting. Mr. Kilgore explained that the cost of this long-term sewer improvement
project and the method/timeline for financing are currently unknown, but
that cost-effectiveness will be one of the most important criteria when
assessing the options, and that information will be shared with the public
as it is developed throughout the project. In addition, Mr. Kilgore explained
that the project schedule is not yet set. The sewer improvement plan will
be submitted to Ohio EPA in 2006 and the schedule will be negotiated at
that time, but an estimated timeframe is approximately 2012 for full implementation
of the sewer improvements.
3. Coordination with the City on sewer-related issues.
Many of the attendees have contacted the City to record basement flooding
problems in the past, and/or to request help in identifying clogs and
other sources of backups. Several attendees commented that the City was
responsive when they requested inspections of their lines and other support.
However, others were not able to resolve their concerns or were unsure
who to contact, leading to some uncertainty about what type of help is
available. One of the goals of the public outreach for this project will
be to provide some clarification to help resolve this issue. |