Public Works
  Engineering
 
  Construction
  Projects Out For Bid
  1998-2007 Capital Projects Budget Graph (PDF)
  Fleet Management
  Parks & Public Property
  Refuse & Recycling
  Streets & Forestry
  Water & Waste Water Collection
 
 

  Storm Water Management Program
  Sewer System Planning Project

Specifications

PDFs require Adobe
Acrobat Reader.

Click for free download
Department of Public Works-
Division of Engineering and Construction
Lakewood City Hall
12650 Detroit Ave.
Lakewood, OH 44107
(216) 529-6805
Email Engineering
STREET AND FACILITY CONSTRUCTION UPDATE
All street improvements are funded by
Capital Improvement Funds and/or
Community Development Block Grant Funds (CDBG)
for qualifying streets.
All Watermain Replacements are funded by the Water Fund.
All Sewer Repairs are funded by the Sewer Fund.
Property Owners will not be assessed.
PROJECT
DETAILS
UPDATE
Deep Grind & Overlay #1
Athens Ave.(Waterbury to Bunts)
Clifton Place(Detroit to South Terminus)
Elbur Ave.(Lakewood Hts. to Madison)
Riverside Drive (Detroit to Maile)

Scope: The work to be accomplished includes planing of the existing asphalt concrete pavement, full depth pavement repairs as needed, resurfacing with asphalt concrete, installation of ADA curb ramps, and installation of new crosswalks. Curbs and driveway aprons will not be replaced as part of this project.
Contractor: The Shelly Company

Project Complete

Deep Grind & Overlay #2
Elbur (Detroit to North End)
Elmwood (Hilliard to Madison)
Mars (Delware to Madison)
Parkwood (Detroit to Franklin)
Westwood (Detroit to Hilliard)
Woodford (Granger to Webb)

Scope: The work to be accomplished includes planing of the existing asphalt concrete pavement, full depth pavement repairs as needed, resurfacing with asphalt concrete, installation of ADA curb ramps, and installation of new crosswalks. Curbs and driveway aprons will not be replaced as part of this project.
Contractor:  The Shelley Co.

Project Complete

Lake Road (Webb to Clifton Blvd.) Scope: Resurfacing & Curb Installation
Contractor:  Tri Mor Corp.

Project Completed

Lakewood Park Lakefront
Scope: Shoreline Protection
Contractor: Middough Consulting, Inc. (design)
Schedule: TBD
Currently in design
Long Term Control Plan
Scope: City-wide sewer system planning project
Contractor: TBD
Schedule: Continuing negotiations with the EPA
Paving Planing & Asphalt Overlay Parking Lots Scope: City Hall Parking Lot, Lakewood Park West Parking Lot (Old Stone House) and Muni Lot #4 (between St. Charles & Warren)
Contractor: TBA
Project Complete

Wastewater Treatment Concrete Repairs

Contractor:  Suburban Maintenance Project Complete
Updated 11/13/2008
 